Step 8 of migrating from TWICE 1.0. This is the switch itself. It is a short day if the previous seven steps are done, and a long one if they are not.

Set the date

Pick a date in your quietest trading period. Set the staff training date and the readiness check date before it, and move all three together if the date moves — a switch date that slips while the training date does not means staff trained on something they then wait a month to use.

Readiness check

One named person signs off, on a date, against every line below. Run it about two weeks out, not the day before: its entire value is that there is still time to fix what it finds. No-go is a normal and cheap outcome at that distance. Signed off by ____________ on ____________
  • Every case in step 5 passed, unaided.
  • Staff are trained.
  • Settings are configured.
  • Payments are connected, and a live-mode transaction is proven.
  • Catalog and inventory reconcile against 1.0.
  • The rollback condition is written down, and everyone knows who decides.

On the switch date

Close every intake channel at once. A channel left open in 1.0 allocates stock that 2.0 has potentially already sold. Confirm each channel is closed before you open 2.0 — not in parallel with it.
  1. Close 1.0 to new orders — every channel at once: website, booking widget, phone workflow, and the counter. After this you only finalise existing orders in 1.0. All new orders are handled in 2.0.
  2. Open 2.0 — store address live, links updated, payments in live mode.
  3. Place a real transaction yourself and check the order, the payment, and the confirmation email. Do not wait for a customer to find the first problem.
  4. Tell every person who can take an order that new orders go into 2.0 only.

Done when

  • Every 1.0 intake channel is confirmed closed.
  • 2.0 is open, on its live address, with payments in live mode.
  • You have placed a real transaction and verified the order, the payment and the confirmation.
  • Everyone who can take an order knows where orders go now.